"Azerbaijan" thermal power station commissioned after major renovation
  • ECONOMY

  • 12:47 25 June 2020

"Azerbaijan" thermal power station commissioned after major renovation

The open distribution units with capacity of 330 and 500 kilovolts, 8 power plants, the Control Dispatcher Center, the main and subsidiary areas, buildings and facilities of the station have been commissioned on June 25 after major renovation, ONA reports.

The event has been attended by the President of the Azerbaijan Republic Ilham Aliyev.

The head of our state has been briefed on the conditions created at the station.

 

ONA

Tags:

RELATED NEWS