Representatives of the diplomatic corps have visited Fuzuli International Airport, ONA reports.
An employee of AZAL Valeh Amiraslanov informed diplomats about the construction of the airport.
He said that construction work of the airport started on January 14.
It was noted that platform with 3 km long, 60 m wide runway, 8 stations created in the demined area. The area of the airport is 250 hectares, 130 hectares of the area have been allocated for construction.